PlanningCloud Compute

Intelligent Computing Cloud Service Center Construction Project

智算云服务中心建设项目
Guangzhou· RMB 1.4802846 billion in planned total investment· Jan 1, 2027 – Dec 1, 2031

The Intelligent Computing Cloud Service Center Construction Project is planned for Jiechuang Building at No. 88 Ruixiang Road, Yunpu Street, Huangpu District, Guangzhou. It has a planned total investment of RMB 1.4802846 billion and is expected to use approximately 8,000 square meters of floor space without constructing new computing-center cabinets.

Intelligent ComputingCloud ComputeAi InfrastructureComputing Power
Sources
PlanningCloud Compute

Volcano Engine GW-level Computing Park (Hohhot)

火山引擎吉瓦级算力中心(呼和浩特)
Ulanqab· Aug 22, 2026

A GW-level intelligent computing center project tied to Volcano Engine, ByteDance's cloud service platform, signed on August 22, 2026 at the 2026 Green Computing Power (Artificial Intelligence) Conference in Hohhot, Inner Mongolia. It was one of 12 projects signed at the conference with a combined planned investment of 186.46 billion yuan, covering green intelligent computing centers, token factories, and computing-power and electricity equipment manufacturing. Sources differ on the siting: the project was signed at the Hohhot conference, while a reference entry places the Volcano Engine GW-level Computing Power Center in Ulanqab City; no separate project-level investment figure or construction start has been disclosed.

data-centerIntelligent ComputingGreen ComputingAi InfrastructureCloud Compute
Sources
PlanningCloud Compute

China Mobile (Ningxia Zhongwei) Data Center Area B B07 Machine Room Building EPC Project

中国移动(宁夏中卫)数据中心B区B07机房楼EPC项目
Zhongwei· RMB 6.149 billion planned investment for the broader Zone B development· Aug 15, 2026 – Dec 15, 2026

The project covers the EPC delivery of the three-story, steel-structure B07 machine room building in Zone B of China Mobile's Ningxia Zhongwei Data Center. Zone B is planned to include six data center buildings and two maintenance support buildings, with a total load of 245.2 MW and capacity for approximately 13,624 physical cabinets; B07 was at the EPC bidding stage with a planned 123-day construction period.

data-centerCloud ComputingComputing InfrastructureSteel Structure
Sources
PlanningCloud Compute

China Mobile (Ningxia Zhongwei) Data Center Zone B B07 Data Center Building

中国移动(宁夏中卫)数据中心B区B07数据中心楼
Zhongwei· Zone B has a planned total investment of RMB 6.149 billion; no standalone investment amount was disclosed for Building B07.· Aug 15, 2026 – Dec 15, 2026

Building B07 is a planned data center facility in Zone B of the China Mobile (Ningxia Zhongwei) Data Center. The three-story steel-structure building will have a construction area of approximately 17,000 square meters and is being procured through an EPC tender, with construction scheduled from August 15 to December 15, 2026. Zone B is planned to include six data center buildings and two maintenance-support buildings, with capacity for approximately 13,624 physical cabinets and a total load of 245.2 MW.

data-centerCloud ComputingComputing InfrastructureServer Cabinets
Sources
Under ConstructionData Center Power

Envision Group Galaxy Campus (Ulanqab)

远景集团乌兰察布星河园区
Ulanqab· Aug 6, 2026 – Dec 31, 2028

Envision Group's Galaxy Campus in Ulanqab, Inner Mongolia is an AI infrastructure campus powered directly by renewable electricity, centered on a 120,000-square-meter AI supercomputing facility designed to host up to 1,000,000 AI accelerators at full build-out. Envision announced commissioning of the campus on August 6, 2026, and it is designed to scale beyond 2GW of capacity. In October 2026, the general manager of Envision's AI Data Center business said the company plans to finish building the campus by the end of 2028, with capacity eventually reaching 3GW and offtake agreements already secured through 2029 or 2030.

data-centerAi InfrastructureRenewable EnergyGreen ComputingAi Accelerators
Sources
CompletedOther

Guangzhou Artificial Intelligence Convergence Empowerment Center

广州市粤港澳大湾区人工智能应用赋能中心
Guangzhou· Jun 18, 2026 – Jun 18, 2026

The Guangzhou Greater Bay Area Artificial Intelligence Application Empowerment Center was officially established and inaugurated on June 18, 2026. It was jointly initiated by six entities: CloudWalk Technology, Guangzhou Digital Technology Group, China Telecom Guangzhou Branch, Jiadu Technology, Guangzhou Cloud Butterfly Technology, and the Guangzhou Artificial Intelligence Industry Development Association. The center is set up as a public service platform aimed at addressing the development needs of the AI industry in Guangzhou and the Greater Bay Area; no investment figures have been disclosed in available sources.

Ai ApplicationPublic Service PlatformGreater Bay AreaIndustry Alliance
Sources
CompletedCloud Compute

Beijing No.1 Token Factory

北京壹号词元工厂
Beijing· Jun 10, 2026

The Beijing Yihao (No.1) Token Factory, Beijing's first token factory, was officially put into operation on June 10, 2026 in the Beijing Economic-Technological Development Area (E-Town). Rather than a traditional assembly line, it consists of rows of servers that generate AI tokens on demand, with Phase I reaching a daily capacity of 1.4 trillion tokens. It aims for a long-term output of 10 trillion tokens per day and plans to link with green-power bases in Zhangjiakou and Ulanqab to form a Beijing-Tianjin-Hebei computing cluster.

Token Factorydata-centerComputing PowerAi InferenceGreen Power
Sources
PlanningCloud Compute

Huawei Ascend SuperPod Token Factory (Wuxi)

华为昇腾超节点Token工厂(无锡)
Wuxi· May 15, 2026

An AI computing power infrastructure project jointly developed by Xiamen-based Hongxin Electronics and the Wuxi High-Tech Zone, signed on May 15, 2026, to build a large-scale Token Factory built on Huawei Ascend 384 SuperPod computing clusters. Reported as the first Huawei Ascend 384 SuperPod cluster in Jiangsu Province, with the first phase planned to deploy four Ascend 384 super-node servers and the longer-term aim of becoming an Ascend SuperPod cluster serving East China. Hongxin Electronics' chairman Li Qiang stated the company's global headquarters for the Token Factory business would relocate to Wuxi, with supporting computing hardware projects planned.

Token FactoryAscendAi InferenceComputing Clusterdata-center
Sources
Under ConstructionCloud Compute

Smart Blueprint Western Intelligent Computing Center

智慧蓝图西部智能计算中心
Qingyang· May 8, 2026

Phase I of the Smart Blueprint Western Intelligent Computing Center is located in the Qingyang East Data West Computing Industrial Park, within the core area of the Qingyang data center cluster under the Gansu national computing hub node. The project obtained its construction land-use right on May 8, 2026 and entered the construction stage. Once completed, it is intended to support AI, big data and cloud computing workloads.

Intelligent Computingdata-centerEast Data West ComputingCloud Computing
Sources
CompletedCloud Compute

Zhengzhou Artificial Intelligence Computing Center

郑州人工智能计算中心
Zhengzhou· Apr 14, 2026 – Apr 14, 2026

The Zhengzhou Artificial Intelligence Computing Center hosts a scientific AI computing cluster at the National Supercomputing Internet's core node in Zhengzhou. The cluster comprises 60,000 specialized processors, including six types of domestically developed core chips, and is designed for AI-for-Science workloads such as drug discovery, new materials and clean energy research. It was officially put into operation on April 14, 2026.

Ai4sSupercomputingComputing ClusterDomestic Ai Chips
Sources
Under ConstructionCloud Compute

Runze (Hong Kong) Sha Ling Data Park

润泽(香港)沙岭数据园区
Sandy Ridge, North District, Hong Kong· HKD 23.8 billion (about USD 3 billion) total investment· Mar 28, 2026

Range Intelligent Computing Technology broke ground on the Runze (Hong Kong) Sandy Ridge Data Park in Sandy Ridge, Northern Metropolis, on March 28, 2026, after winning the sole bid for the 116,365 sqm site in early March. The park will have 250,000 sqm of gross floor area, with nearly 90 percent planned for high-end data center use, and is targeted to deliver 180,000 PFLOPS by 2032, around 36 times Hong Kong's current compute capacity. The project uses Range's converged architecture and in-house liquid cooling technology; partial operation is planned for July 1, 2027, with full operation expected in 2029.

data-centerLiquid CoolingAi ComputeHong KongGreater Bay Area
Sources
Under ConstructionCloud Compute

Range (Hong Kong) Sha Ling Data Park

润泽(香港)沙岭数据园区
Hong Kong· Mar 28, 2026

The Range (Hong Kong) Sha Ling Data Park is an advanced data center and computing infrastructure project spanning approximately 110,000 square meters in Hong Kong's Northern Metropolis. Construction began on March 28, 2026, and the facility is expected to enter service within 42 months; its computing capacity is projected to reach 180 ExaFLOPS by 2032.

data-centerComputing InfrastructureAi ComputeCloud Computing
Sources
Under ConstructionCloud Compute

Xining Intelligent Computing Center

西宁智算中心
Xining· RMB 950 million total investment· Mar 23, 2026

The Xining Intelligent Computing Center was formally signed into the Nanchuan Industrial Park of the Xining (National) Economic and Technological Development Zone, with total investment of RMB 950 million. The project retrofits about 3,000 square meters of existing China Mobile machine room space to build a 10,000 PFlops-class hybrid computing center, with a 5,000 PFlops first phase, combining general-purpose compute with domestic chips and focusing on dedicated large-model services for firms such as Tencent and local SMEs. It is the first landed green-computing project under the Beijing-Xining-Yushu "Beijing data, Qinghai compute" cooperation; local company registration and project filing are complete, machine room retrofitting and equipment move-in are underway, and operation is planned for June.

data-centerIntelligent Computing CenterGreen ComputingDomestic ChipsLlm
Sources
Under ConstructionCloud Compute

Hainan Jiuyao Xining Intelligent Computing Center

海南九曜西宁智算中心
Xining· RMB 950 million total investment· Mar 23, 2026

The Xining Intelligent Computing Center was signed into the Nanchuan Industrial Park of the Xining (National) Economic and Technological Development Zone on March 23, 2026, with total investment of RMB 950 million. It is the first green-computing flagship project landed under the "Beijing data, Qinghai compute" cross-regional cooperation, retrofitting about 3,000 square meters of existing China Mobile machine room space into a 10,000 PFlops-class hybrid computing center, with a 5,000 PFlops first phase built on general-purpose compute supplemented by domestic chips for dedicated large-model services. Local company registration and project filing are complete, machine room renovation and equipment move-in are under way, and the operator plans to bring the first phase online in June 2026 before starting phase two.

data-centerIntelligent ComputingGreen ComputingDomestic ChipsLlm
Sources
Under ConstructionCloud Compute

Chaozhisuan Intelligent Computing Center

超智算智能算力中心
Beijing (Shijingshan District)· Mar 6, 2026

An intelligent computing center in Beijing's Shijingshan District, unveiled on March 6, 2026 at an AI compute equipment lighting ceremony, with the first batch of high-performance AI compute clusters brought online. The facility uses liquid-cooled high-performance AI server clusters and is positioned to provide compute services to universities, research institutes and enterprises for large-model training and AI inference. Local officials and the operator describe the unveiling as the formal start of construction of the platform, which combines compute supply, R&D and ecosystem incubation.

data-centerLiquid CoolingAi ComputeLlm TrainingBeijing
Sources
PlanningCloud Compute

Sandy Ridge Data Park

沙岭数据设施群
North District, New Territories, Hong Kong· About $23.8 billion of investment from development through the first three years of operation· Mar 2, 2026

The Hong Kong Government awarded the Sandy Ridge Data Facility Cluster site, over 110,000 square metres in North District, New Territories, to Hong Kong Range Intelligent Computing Technology Company Limited on 2 March 2026 under a 50-year land grant. The scheme covers a total gross floor area of 250,000 sq m, with about 90 per cent dedicated to high-tier data centre use, and carries a 72-month building covenant. The site was rezoned for innovation and technology use in November 2025 following an open tender run from 10 October to 31 December 2025, and is estimated to generate economic output of about $4.6 billion and around 180 skilled positions in the first three years of operation.

data-centerAi InfrastructureComputing PowerLand TenderHong Kong
Sources
CompletedCloud Compute

National Supercomputing Internet Core Node (Zhengzhou)

国家超算互联网核心节点(郑州)
Zhengzhou· Feb 5, 2026 – Jul 9, 2026

The National Supercomputing Internet core node in Zhengzhou, Henan Province, began trial operations on February 5 with a cluster powered by more than 30,000 domestically developed AI accelerator chips, and officially went online on July 9, 2026, offering over 100,000 AI computing cards at full-load operation. China's largest scientific AI computing cluster was put into operation at the node on April 14, 2026. Observers say the node fills a gap in computing power hubs in Central China and supports nationwide coordinated allocation of supercomputing resources.

SupercomputingAi ComputingDomestic ChipsComputing Power Networkdata-center
Sources
CompletedCloud Compute

National Supercomputing Internet Core Node (Zhengdong New Area)

国家超算互联网核心节点(郑东新区)
Zhengzhou (Zhengdong New Area)· Feb 5, 2026

The core node of China's national supercomputing internet has come online in Zhengzhou, Henan Province, described as the largest single domestic AI computing resource pool, offering over 100,000 AI computing cards. It began trial operation on Feb. 5, 2026 with more than 30,000 domestically made AI accelerator chips, which had increased to 60,000 units by mid-April 2026 when China's largest scientific intelligent computing cluster was put into operation there. More than 300 key super-intelligent integrated applications have been adapted on the node, spanning materials science, electromagnetics, quantum computing, biomedicine, astronomy and meteorology.

data-centerSupercomputingAi ChipsGPUDomestic Chips